Home · Insights · Dry port & ICD

What is the difference between an ICD, a dry port and a logistics center when preparing a project?

The three terms are often used interchangeably. Distinguishing them correctly from the start helps fix the operating chain, land demand and documents to be prepared.

When starting a logistics infrastructure project, the name is often chosen before the operating model is clear: ICD, dry port, logistics center, warehousing. That easily leads to a master layout with all the facilities but no answer to how cargo enters, is handled and leaves. This article offers a practical framework to help project owners start with the right questions.

Dry port (ICD): a hub tied to containerized cargo and procedures

Under the legal framework for investment, construction, management and operation of dry ports, a dry port is part of the transport infrastructure and organizes transport linked to seaports, border gates and other transport modes. So when discussing an ICD/dry port, the first questions to answer are: which container cargo flows pass through, where it connects to, and how handover, yard storage and inspection are organized.

On the site plan, this usually calls for a gate area, container yard, cargo inspection area or other suitable operations area, tractor routes and buffer zones to avoid cutting across traffic flows. Three errors in container yard layout are mistakes that should be checked right at the first layout option.

Logistics center: broader service ecosystem

A logistics center has a broader scope than a container yard. Under national logistics center development guidance, this type of facility connects with seaports, dry ports, airports, railway stations, roads, border gates and production areas, aiming to support circulation, distribution and value-added services. A center may include warehousing, distribution, order processing and cargo support services and may connect to an ICD, but it is not automatically the same as an ICD.

Bonded warehouse: customs function, not the name of the entire area

A bonded warehouse is a specialized function for storing goods under customs supervision. It can be one component of a logistics complex if the cargo model and procedures are suitable, but the term “bonded warehouse” should not stand in for the whole site planning problem.

Four data items to settle before choosing a project name

Cargo source and destination. Does cargo come from industrial parks, border gates, seaports or the domestic market, and where does it go next?

Cargo unit. Containers, pallets, bulk cargo, refrigerated cargo or e-commerce goods each create a different handling chain.

Mode of transport. Road only, or also waterway and rail? This data determines connection points and holding areas.

Value-added services. Yard storage only, or also packing, sorting, inspection, customs clearance and distribution? Each step needs its own area, equipment and flow.

How to turn this into a feasibility dossier

The project name should be the outcome of the operating model, not the starting point. Once the four data items above are clear, the consultant can propose the land-use structure, investment phasing and a brief for 1/500 detailed planning that is well grounded. For projects with ICD or customs elements, project owners need to separately verify current conditions and procedures with the competent authorities.

References

Decree 38/2017/NĐ-CP on investment in construction, management and operation of dry ports; Information on Decision 1012/QĐ-TTg and the orientation for logistics centers.

Try it now with your project

Share this article: Facebook LinkedIn
WANT TO DISCUSS SPECIFICS?

Send your project constraints

Area, location, type and current stage — that's enough to get started.

Submit a consultation request
Call 0989 229 628Send a request