Free form · Warehouse design

Questionnaire for investors before designing a logistics warehouse

49 questions in 8 groups that the consulting unit needs the investor to answer before making a plan: goods and operations, total area, architecture, structure, electricity, water supply and drainage, wastewater treatment and fire prevention. Answering enough from the beginning helps avoid multiple-round design revisions.

Use

Download the Excel file, fill in the column "Investor's response"; Undetermined items write "Unknown". The "Example answer" column is a reference from designed warehouses, not a recommendation for every project. Return it to CGD with an extract of land boundaries and construction regulations of the industrial park.

List of questions

SttQuestionConsultant's suggestionsAnswer example
IGENERAL INFORMATION
1Project name, investor, contact person (full name, position, phone, email)
2Location of land (IZ/CCN, province), land area (m²), shape, road interfacesAttached is an excerpt/boundary map
3Land legal: Investment certificate, land lease/sublease contract for industrial park land, detailed planning 1/500Yes / Working / Not yetThere is no land lease contract yet; No investment certificate required
4Planning criteria of the industrial park: construction density, height, setback, ratio of green treesAccording to industrial park regulations — Investor provides if anyMinimum 20% green trees: agree
5Intended use: normal warehouse / cold storage / bonded warehouse / dangerous goods warehouse / distribution centerSelect 1 or moreRegular warehouse
6Exploitation model: self-exploitation / rental (1 customer or many customers) / build according to customer requirements (BTS)
7Expected progress: basic design documents, technical design - construction, start of construction, and put into operationRecord month/year
8Expected budget/investment rate (VND/m² of floor) and scope of consultation (design, estimate, permission, supervision)
9Is there a reference project you want to follow (name, photo, profile)?According to the inventories made by the investor
IIGOODS AND OPERATION
1Type of goods stored, characteristics (flammable, chemicals, lithium batteries, food, refrigerated goods)Decide on a fire prevention planRegular goods
2Is there a warehouse for chemicals/dangerous goods? If yes: name, hazard group, mass
3Storage method: floor / selective shelves / drive-in shelves / high-rise shelves; Number of shelves, maximum stacking height (m)Placed on the floor, shelves can be installed; 5 tiers of shelves
4Lifting equipment: electric/diesel forklift, reach truck, AGV; quantity; Is there a battery charging area? (number of locations)5-position battery charging house
5Number of working days/month, number of shifts/day, number of people per shiftCalculate water supply, wastewater treatment, parking lot30 days × 2 shifts; 10–15 people/shift
6Vehicle traffic in and out/day, largest vehicle type (40' container, 15 ton vehicle...), parking area
7Are there requirements for temperature/humidity control, insect protection, clean rooms?Not insect resistant
IIIINFRASTRUCTURE TOTAL GROUND
1Internal road: cement concrete or asphalt concrete (asphalt); design vehicle loadCement concrete
2Fire protection road around the house and shelter for fire engines (minimum 7×8 m) — recommended locationThe road behind the warehouse must be at least 3.5 m; The parking area is located at the partition between the two warehouses
3Gate - fence: which side is open, which side is closed; guard house, barrier, vehicle scale2 front sides are open fenced, 2 side sides are closed fenced
4Parking lots for cars, motorbikes and trucks; car roof
5Support areas need to be arranged: pump house - fire protection water tank, transformer station, generator, wastewater treatment station, garbage house, charging houseMark required itemsThere are all categories
IVARCHITECTURE
1Estimated warehouse area (m²), number of compartments/warehouses, whether fire partitions are divided between warehouses
2Clearance height / maximum operating height of the warehouse (m)Depends on shelf height[need investor confirmation]
3Warehouse floor level compared to yard (high dock or low dock), number of dock doors, door sizeThe warehouse floor is 1.2 m higher than the yard; rolling door 5.17 × 5.17 m
4Hydraulic lifting platform (dock leveler): quantity, load, capacity; dock canopy6 docks, 6 tons, 0.75 kW; Power supply to the dock
5Warehouse cover: how high is the brick wall, above the corrugated iron; roof materials; light panels; roof insulationBrick wall 3 m high, on corrugated iron
6Warehouse floor finishing: grinding, polishing / hardening (type of material) / epoxy paintLithium-based hardener (Ashford Formula)
7Ventilation - natural lighting: louvers, windows, ventilation slots, facade panelsLouver; no windows; Illuminate the facade according to the column cavity
8Office area: number of floors, structure (reinforced concrete or steel - deck floor), ceiling, clear height2 floors, deck floor, plaster ceiling, clearance 2.82 m
9Number of people and office rooms; separate management room; meeting room, cafeteria, WC, bathroom, changing room20–30 people; 3–4 rooms/floor; 1 management room
10Requires project form, brand identification colors, and signs
11Aiming for green building certification (EDGE, LEED, LOTUS) or rooftop solar power?
VTEXTURE
1Warehouse floor live load (tons/m²) by type of shelf and goods5 shelves ≈ 3 tons/m²
2Desired column pitch/span (affects shelf layout, forklift access)
3Roof hanging load (solar power, fans, sprinkler pipes)
4Are there any geological survey documents? If not, has CGD conducted a survey?
VIELECTRICITY – AIR CONDITIONING – VENTILATION – LIGHT ELECTRICITY
1Transformer station: dry or diesel; outdoor kiosks or station rooms; expected capacityKiosk suitable for outdoor, diesel engine
2Backup generator: yes/no, priority load
3Office air conditioning: local or central (VRV/chiller); hot spot locationLocal; hot block in front of the warehouse
4Warehouse ventilation: natural (louver) + wall-mounted industrial fan / HVLS ceiling fanLouver + wall-mounted industrial fan
5Warehouse lighting: lux required, LED high-bay lights, sensors
6Light electricity: LAN, phone, wifi, CCTV (warehouse, yard, fence), access control, alarmLAN/voice at VP, security; CCTV warehouse and road yard
VIIWATER SUPPLY – WASTEWATER TREATMENT
1Water supply source (industrial park / well), connection point
2Wastewater: mainly domestic or production wastewater; Output standards (column A/B/C according to industrial park)Living (WC, bathroom); output according to industrial park requirements
3Wastewater treatment station: reinforced concrete tank or composite module; CGD proposes technology or investors hire suppliers themselvesConsulting on technology proposals and station design
4Rainwater drainage: connection point, regulating pond (if required by the industrial park)
VIIIFIRE PROTECTION AND PREVENTION
1Warehouse fire fighting system: sprinkler (ESFR/regular type), water hydrant on walls, outside pillarsDepends on goods type and stacking height
2Automatic fire alarm, smoke extraction, emergency lighting, emergency exits
3Does the investor require insurance (FM Global...) or only according to Vietnamese standards?
Fire prevention and fighting plans, output wastewater standards and planning targets depend on the type of goods, loading height and regulations of each industrial park; The consultant will review current standards when preparing documents.