CGD reviews basic designs, construction drawings, cost estimates and feasibility study reports. This is a regular line of work for the company in logistics and aviation infrastructure.
The Class 1 certificate for design and design review of civil works, issued by the Ministry of Construction, allows CGD to take on review assignments for civil works of every grade, with no limit on scale.
Scope of work
- Basic design review
- Construction drawing design review
- Review of cost estimates and total construction cost estimates
- Feasibility study report review
- Review of applicable standards, codes and structural solutions
- Review report with recommended revisions and meeting minutes with the design firm
Why choose CGD for this work
- Certificate Rank 1 design and design review of civil works — Ministry of Construction, September 27, 2023.
- Certificate for design and design review of industrial buildings, road works, irrigation and dikes.
- A separate cost estimating team handles the estimate review, independent of the design group.
Projects delivered
2 projects in the portfolio use this service.
Related free tools
The steps for investment approval, land, 1/500 planning, environment, fire safety and permits, according to project type.
Capital estimate & investment returns →Investment capital, rental cash flow, IRR, NPV, borrowing, taxes and payback period.
Related articles
- Checklist for selecting an ICD (dry port) design consultant
- Cold storage design: 7 decisions that must be finalized before drawing the floor plan
- Warehouse floor elevation and dock doors: figures the owner lives with throughout the operating life
- What a design review checks, and why the design firm cannot check it itself
Frequently asked questions
What does Class 1 certification mean?
Class 1 is the highest class in the construction capability certificate system. An organization holding a Class 1 certificate can take on design and review assignments for works of every grade within its licensed field, with no limit on scale.
Can the design unit and verification unit be the same?
No. By regulation, the review must be carried out by an organization independent of the designer. Whichever role CGD takes, it does not take the other on the same set of documents.
What does the review result include?
The review report states clearly what passes, what needs revision with the supporting standards, and a quantity reconciliation table — plus the cost estimate if cost review is included.