Border gate infrastructure and customs clearance zones
At the border gate, goods change vehicles, change management regimes and sometimes even change working hours between the two sides of the border. The infrastructure must have enough space for vehicles to wait, for loading, and for inspection agencies to work at the same time.
Where do investors often get stuck?
Agricultural season, year-end, when policies across the border change — the number of waiting cars can skyrocket. If there is a shortage of parking lots, cars will spill out onto the highway.
Goods transferred from Vietnamese vehicles to foreign vehicles or vice versa need a loading area, temporary warehouse, and lifting equipment in the right place.
Customs, animal and plant quarantine, border guards — each side needs its own working area and inspection flow without crossing each other.
Customs clearance models, opening hours, and product lists are subject to change; The design needs to be flexible to adjust without having to tear it down.
Specific design constraints
- The parking lot waiting for customs clearance is large enough, separating the flow of incoming and outgoing vehicles
- Loading area, bonded warehouse, temporary covered warehouse
- Chemical inspection and quarantine areas and offices of agencies
- Payment infrastructure, vehicle weighing, screening
- Logistics service area for drivers
What does CGD do for this type?
Consulted projects (3)

Parking lot, warehouse and logistics area at Moc Bai border gate

Viettel Lang Son cargo transit yard

General merchandise trade center, warehousing, cargo transshipment and logistics services
Try before drawing: relevant simulation
AI perspective by type
Frequently asked questions
How many cars should the waiting area at the border gate accommodate?
According to peak daily vehicle volume and actual customs clearance waiting time, not according to the annual average. CGD builds peak scenarios from exploitation data of the border gate and surrounding areas.
What border gate projects has CGD done?
The list below lists the border gate projects CGD has consulted on, with the scale and scope of work.
Is there a border gate infrastructure project and border clearance area? Submit your binding to CGD
Land boundaries, expected output, desired progress — CGD provides feedback on the scope of consultation and implementation time.
Submit a consultation request