Specialties · 11 projects

Industrial parks and industrial clusters

Whether an industrial park can be sold or not depends on what secondary investors see first: whether the infrastructure is available, whether there is enough electricity and water, and how the road to the port is. Planning must answer those questions before answering the question about the land plot.

11projects in the portfolio
579 haTotal scale is announced
8provinces and cities

← Six majors

Where do investors often get stuck?

Land use structure

The ratio of industrial land, trees, traffic, and technical infrastructure must meet regulations while there is still enough land for rent for the project to be effective.

Synchronous technical infrastructure

Electricity, water supply, drainage, centralized wastewater treatment - missing one item means the area cannot welcome investors, even though the land has been leveled.

Legal progress

Planning, investment policies, land, and environment follow one another; One slow step drags down the whole project.

Investment efficiency by period

Investing in infrastructure once for the whole area is capital accumulation; Reasonable phasing helps rental cash flow stay ahead of expenses.

Specific design constraints

  • Planning functional zones and internal traffic network for container trucks
  • Electrical infrastructure, water supply and drainage, centralized wastewater treatment station
  • Ground leveling, level control, rainwater drainage
  • Flexible land plots for many sizes of investors
  • Green infrastructure: factory rooftop solar power, energy storage

What does CGD do for this type?

Projects consulted (11)

Rendering of Hoanh Bo industrial, urban, service and seaport complex
Industrial

Hoanh Bo industrial park, urban area, services and seaport

Scale 389 haHoanh Bo, Quang NinhInvestor: Joint venture of Aviation Logistics Joint Stock Company and International Investment, Trading and Services Joint Stock CompanyConsulting on preparing proposal documents for construction investment projectsView project →
Rendering of Phu Ninh Industrial Park, phase I
Industrial

Phu Ninh Industrial Park phase I

Scale 80,1 haPhu Ninh, Phu ThoInvestor: Not yet disclosedConstruction consultingView project →
Rendering of high-tech pig fattening farm
Industrial

High-tech pig fattening farm

Scale 42.15 ha · 40,000 pigs per batchKim Son commune, Bao Yen, Lao CaiInvestor: Thinh Phat Kim Son 1 Joint Stock CompanyConsulting on detailed construction planning at 1/500 scaleView project →
Rendering of Ngo Quyen Industrial Cluster technical infrastructure
Industrial

Technical infrastructure of Ngo Quyen Industrial Cluster

Scale 30 haHung YenInvestor: ALS Infrastructure Investment Company LimitedConsulting on construction supervision and equipment installationView project →
Rendering of the project at Hoa Lac Hi-Tech Park
Industrial

Project at Hoa Lac High-Tech Park

Scale 30 haHoa Lac, HanoiInvestor: Not yet disclosedConstruction consultingView project →
Rendering of Phu Yen Industrial Cluster
Industrial

Phu Yen Industrial Cluster

Scale 6 haDak LakInvestor: Not yet disclosedMaster planning and investment project preparationView project →
Rendering of Honda car and motorbike dealership
Industrial

Honda car and motorbike dealer

Scale 15.000 m²Tich Giang, Phuc Tho, HanoiInvestor: D&C General Business Investment Joint Stock CompanyConstruction drawing design and cost estimate preparationView project →
Rendering of Van Du Industrial Cluster
Industrial

Van Du Industrial Cluster

Scale Industrial clusterQuang VinhInvestor: Not yet disclosedMaster planning and engineering designView project →
Rendering of Ngoc Lac pig farm
Industrial

Ngoc Lac pig farm

Scale Livestock farmNgoc Lac, Thanh HoaInvestor: Not yet disclosedConstruction consultingView project →
Rendering of Binh Duong BESS energy storage project
Industrial

BESS Binh Duong power storage project

Scale Electricity storage plantHo Chi Minh CityInvestor: Not yet disclosedConstruction consultingView project →
Rendering of Dak Lak pig farm
Industrial

Dak Lak pig farm

Scale Livestock farmDak LakInvestor: Not yet disclosedConstruction consultingView project →

Try before drawing: relevant simulation

AI perspective by type

Read more

Frequently asked questions

What part of the industrial park project does CGD take on?

Planning, setting up investment projects, verifying feasibility study reports and supervising infrastructure construction — the scope of each project is listed in the list below.

Quickly check whether a plot of land can be used as an industrial park?

Use the Land Survey and Land Survey tools from coordinates to view boundaries, area and satellite images over the years, then send to CGD to evaluate planning and connection infrastructure.

NEXT STEP

Are there industrial park and industrial cluster projects? Submit your binding to CGD

Land boundaries, expected output, desired progress — CGD provides feedback on the scope of consultation and implementation time.

Submit a consultation request
Call 0989 229 628Send a request