Estimate the budget for building a house before finalizing the plan
Enter the plot, planned building footprint and number of floors to see an indicative budget. Default unit costs are taken from Decision 425/QĐ-BXD, Q4/2025 price level — adjustable for your locality and actual quotes.
Preliminary budget
For comparing options; not a detailed cost estimate or a quotation from CGD.
- Excludes land purchase, loose furniture/equipment, special finishes, soft-ground treatment and project-specific costs.
- Do not apply this formula to prefabricated/modular houses, renovations, houses with basements, or multi-story houses whose floors differ in area. Such cases require separate consulting and a separate cost estimate.
- “Remainder of the capital rate” is the difference between the two published columns, not a separate quotation for each service. The tool does not split rough construction and finishing without a bill of quantities.
Send your brief to CGD to review and prepare a cost estimate suited to the project →