Permitting roadmap for ICD projects, warehouses and logistics centers

Select the project type and land status. CGD lays out the steps from investment approval, land, 1/500 planning, environment and fire safety to construction permit and commissioning, with the main documents typically required at each step.

Project brief

No login required. Step status is saved in this browser and is not sent anywhere.

Steps to complete

    Note: this is a reference roadmap for preparing documents, not a legal opinion. The competent authority, document requirements, sequence and exemptions vary by locality, scale, and type and grade of works, and by the legislation in force. Verify with the competent authority or a lawyer before filing.
    Frequently asked questions

    Quick questions about this tool

    Does this roadmap replace legal advice?

    No. This is a reference roadmap for preparing documents. The competent authority, document requirements, sequence and exemptions vary by locality, scale, and type and grade of works; verify with the competent authority or a lawyer before filing.

    Why does each type of project have a different number of steps?

    Some types have their own procedures: an ICD must be checked against the dry port system master plan and announced open before operating; bonded warehouses and CFS need customs recognition; cold storage needs equipment inspection; dangerous goods warehouses have their own safety conditions; foreign investors add an investment registration step.

    Why is there no timeline for each step?

    Processing time depends on the documents, the locality and each case. CGD does not give figures it cannot verify.

    Where is the status of the steps I marked saved?

    In the browser you are using; it is not sent to CGD. Clearing browser data or clicking “Clear marks” erases it.