Design simulation · Test before drawing

Fifteen simulations to spot bottlenecks before you draw the layout

Each simulation is a simple, deterministic calculation model: enter your parameters, change one, and watch the results change accordingly. They do not replace simulation with real data — but they are enough to show which questions to ask a consultant.

Select simulation

01

Screen a site from VN-2000 coordinates

Paste cadastral survey coordinates → GPS, area, boundary, depth profile, Sentinel-2 satellite images across the years.

Open simulation →
02

Distribution warehouse

Pallets, inbound/outbound per day → warehouse m², dock doors, forklifts, truck yard, land area.

Open simulation →
03

BESS battery storage

Peak-hour load → battery capacity, power, containers, EVN tariff difference; charging from surplus solar.

Open simulation →
04

Warehouse rooftop solar

Roof area, daytime load → kWp, regional output, self-consumption, savings at EVN tariffs.

Open simulation →
05

Cold storage: m², kW, electricity bill

Number of pallets, temperature, rack type → area, cooling load by heat source, compressor power, annual electricity cost, dock doors.

Open simulation →
06

High-rise parking garage with AGVs

Number of spaces, floors, peak-hour parking/retrieval requests → number of AGVs, lifts, cabins and customer waiting time.

Open simulation →
07

Port and ICD sizing from throughput

One TEU/year figure → land, berths, yard, gate. Runs the whole chain of tools, with links to each detailed section.

Open simulation →
08

High-bay warehouse (AS/RS)

Stacker crane or multi-level shuttle — enter the inputs, see capacity, queues and bottlenecks at peak times or during disruptions.

Open simulation →
09

Container terminal & berths

Quay cranes, AGVs, yard cranes — second-by-second simulation, three dispatching rules, see which tier the bottleneck sits in.

Open simulation →
010

AMR warehouse robot dispatching

Two dispatching rules on the same job list — completion time, distance, load imbalance.

Open simulation →
011

Prefab house assembly

Foundations, columns, floor slabs, wall panels, roof panels under load-transfer rules — count crane repositionings versus the assembly machine.

Open simulation →
012

What is BIM?

One model, many drawings: click a component to see its data, change the model and the documents update automatically, with automatic clash detection.

Open simulation →
013

What is a digital twin?

Digital twin of the port: switch on sensors, test options before doing it for real, recalibrate when the twin drifts.

Open simulation →
014

Container yard: how many ground slots?

Enter TEU/year and dwell time (days) — number of ground slots, area, rehandling, number of RTGs or reach stackers.

Open simulation →
015

Port gate: how many lanes?

Trucks arrive at the gate second by second — number of lanes, OCR or manual, appointment slots; queues and gate capacity.

Open simulation →
NEXT STEP

Have a real case? CGD builds the model on your operating data and drawings

Planning, design and automation for warehouses, ports and ICDs — from concept simulation to design documentation.

Submit a consultation request
Call 0989 229 628Send a request