Warehousing and logistics infrastructure
The most expensive warehouses are warehouses with the wrong floor plan: missing dock doors, lower ceilings than needed shelves, and cramped parking lots. Those decisions are in the first drawings and are almost impossible to change after construction.
Where do investors often get stuck?
If there is no door, the car will wait outside the gate even if there is room in the warehouse; Without a turning yard, the whole area is congested. The number of doors must be calculated according to peak import and export hours.
In the same area, selective shelves, narrow aisle shelves or automatic warehouses have vastly different capacities — and each type requires different clear heights and floors.
Refrigeration load, insulation, doors and buffer zones determine the monthly electricity bill throughout the life of the warehouse, not just the construction cost.
AGV, AMR or AS/RS are only worth investing in when output and products are stable enough; Doing it too early means freezing capital, doing it too late means having to renovate running warehouses.
Specific design constraints
- The elevation of the warehouse floor and dock floor depends on the service vehicle
- Clearance height, column grid, floor flatness according to type of shelf and equipment
- Dock door, roof overhang, parking lot and container turning radius
- Fire protection for high-rise warehouses
- Cold storage: insulation, buffer zone, anti-fog, cold load
What does CGD do for this type?
Projects consulted (16)

Bac Giang International Logistics Center

Van Thuan wholesale market

International shopping center

Master planning for Thanh Tri truck terminal and public services

ILS Hoai Duc Outlet Center

Thai Nguyen off-airport air cargo warehouse

Gia Lam truck terminal, parking lot and car showroom

Van Thuan Logistics and Distribution Services Center

HTP Center — ILS

Hong Van Port Import-Export Goods Showcase Center

Bac Ninh chemical warehouse phase 3

Smart parking lot at K Tan Trieu Hospital

Dong Anh parking lot K5–K7

CN2 chemical warehouse

CF Hung Yen Automated Cold Storage

Viettel Logistics Warehouse, Minh Duc Industrial Park
Try before drawing: relevant simulation
AI perspective by type
Read more
Frequently asked questions
How much land is needed for a warehouse of 10,000 pallets?
Depends on shelf type, height and import and export flow. Simulate CGD's Distribution Warehouse for rough numbers from your specifications; For real projects, CGD is calculated based on goods, import-export schedule and specific land area.
When should you make an automatic warehouse?
When the output is large enough and stable, the products are uniform, the cost of land or labor is high. Simulation of the AS/RS High-Rise Warehouse shows the trade-off between shelf height, number of rows, and crane capacity.
Are there warehouse and logistics infrastructure projects? Submit your binding to CGD
Land boundaries, expected output, desired progress — CGD provides feedback on the scope of consultation and implementation time.