Master planning consulting

Master planning decides most of a logistics facility's operating efficiency. Yard layout, truck routes and platform levels are fixed here; changing them later costs many times more.

CGD prepares 1/500 detailed plans, 1/2000 zoning plans and partial plan adjustments for dry port (ICD) projects, logistics centers, industrial parks and clusters, urban areas and specialized facilities.

For logistics projects, we test each option against the actual operating problem: when a container truck enters the gate, which route does it take, where does it park, what turning radius does it need, which door does the cargo go through into the warehouse and which way does it leave? A layout that cannot answer that chain of questions is not yet a viable option.

Scope of work

  • Planning brief and explanatory report preparation
  • Detailed construction plans at 1/500 scale
  • Zoning plans at 1/2000 scale
  • Partial plan adjustments and site layout adjustments
  • Site layout options and functional workflow
  • Technical infrastructure planning: transport, site grading, drainage, power supply, water supply
  • Submission documents for appraisal and responses to the authorities

Why choose CGD for this work

  • Capability certificate for construction planning, issued by the Hanoi Department of Construction.
  • Has prepared master plans for projects ranging from a few hectares up to 389 ha.
  • The planning team works with the transportation and technical infrastructure team right from the first sketch.

Projects delivered

25 projects in the portfolio use this service.

See all 25 projects →

Related free tools

Related articles

Frequently asked questions

What planning scales can CGD prepare?

Detailed 1/500 plans and 1/2000 zoning plans, plus local master plan adjustments. Certificate of capability for construction planning issued by the Hanoi Department of Construction in 2022.

How long does a 1/500 plan usually take?

It depends on the scale and the readiness of the input data. For a 15–30 ha area with a topographic map available, preparing the plan usually takes about 2–3 months, excluding consultation and appraisal time.

Is a topographic survey needed first?

Yes. CGD also handles topographic and geotechnical surveys, so the project owner does not have to coordinate two contractors at this stage.

NEXT STEP

Submit project constraints, get feedback on scope and timing

Area, location, type and current stage — that's enough to get started.

Submit a consultation request
Call 0989 229 628Send a request