Specialization · 5 projects

Air cargo terminal

The cargo terminal is not a large warehouse located next to the airport. It is located on the boundary between the flight area and the ground area, runs according to the flight schedule, and must handle normal goods, refrigerated goods, dangerous goods, and high-value goods at the same time.

5projects in the portfolio
20 haTotal scale is announced
4provinces and cities

← Six majors

Where do investors often get stuck?

Airport security boundary

Airside and landside subdivisions, screening points, access control - one wrong flow means you have to redo the whole area.

Peak time according to flight schedule

The amount of goods is accumulated according to take-off and landing times, not divided equally throughout the day. Capacity must be calculated for peak hours, not average.

Many types of special products

Refrigerated goods, dangerous goods, high-value goods, live animals... each type needs its own area, its own conditions and must still be in one line.

Many subjects operate together

Airports, customs, airlines, ground service units — the design must be approved by many parties, extending the appraisal time.

Specific design constraints

  • Clearance height and column grid for ULD shelving system (ETV)
  • Large load-bearing floor, flat floor for lifting equipment
  • Truck door on the ground side and dolly door on the flight deck side
  • Screening area, customs inspection area, cold storage in the station
  • Install and monitor cargo handling equipment

What does CGD do for this type?

Projects consulted (5)

Try before drawing: relevant simulation

AI perspective by type

Read more

Frequently asked questions

How is an open-air warehouse different from a cargo terminal?

The extended airport warehouse is located outside the airport area but serves part of the function of a cargo terminal under customs supervision, so the airport security design should be lighter but still must meet the requirements of monitoring and connecting transport to the airport.

At what stage does CGD participate?

From project planning, design, verification to construction supervision and equipment installation — the project list below clearly states the scope of each project.

NEXT STEP

Is there a cargo terminal project? Submit your binding to CGD

Land boundaries, expected output, desired progress — CGD provides feedback on the scope of consultation and implementation time.

Submit a consultation request
Call 0989 229 628Send a request