
CGD's scope of work
Planning and investment project preparation consulting.
Plan visuals

Run an estimate for a similar project
Warehouse rooftop solar: how much to install, what return? →
Roof area, daytime load → kWp, output, savings at EVN tariffs.
Battery storage: how many kWh to avoid peak hours? →Peak load → battery capacity, containers, EVN tariff differential savings.
Distribution warehouse: how many m², how many dock doors? →Pallets, import/export/day → warehouse, dock, forklift, land.
Site screening →Screen a site: access, current status and missing documents before design.
View sample AI rendering: industrial park →
Projects of the same type

Industrial
Van Du Industrial Cluster

Industrial
Project at Hoa Lac High-Tech Park

Industrial
Ngoc Lac pig farm
Other projects in Dak Lak
- Dak Lak pig farm · Industry · Livestock farms
- Phu Dong hotel area · Urban & services · 1.5 hectares
SIMILAR PROJECTS?
Send your project constraints
Area, location and current stage — that's enough to get started.
Submit a consultation request