
CGD's scope of work
Construction drawing design and cost estimate preparation.
Plan visuals



Run an estimate for a similar project
Warehouse rooftop solar: how much to install, what return? →
Roof area, daytime load → kWp, output, savings at EVN tariffs.
Battery storage: how many kWh to avoid peak hours? →Peak load → battery capacity, containers, EVN tariff differential savings.
Distribution warehouse: how many m², how many dock doors? →Pallets, import/export/day → warehouse, dock, forklift, land.
Site screening →Screen a site: access, current status and missing documents before design.
Projects of the same type

Industrial
Technical infrastructure of Ngo Quyen Industrial Cluster

Industrial
Phu Ninh Industrial Park phase I

Industrial
Phu Yen Industrial Cluster
Other projects in Hanoi
- Hai Boi residential area · Urban & housing · 1.4 hectares
- Son Tay Port office building · Waterway port · 0.5 ha
- AIRIMEX office building · Urban & services · 0.2 ha
- Strategic consulting for Interserco Joint Stock Company · Strategic consulting · Corporate strategy
SIMILAR PROJECTS?
Send your project constraints
Area, location and current stage — that's enough to get started.
Submit a consultation request