
CGD's scope of work
Construction drawing design and cost estimate consulting.
Plan visuals

Run an estimate for a similar project
Automated terminal dispatching simulation →
Quay cranes, AGVs and yard cranes second by second — which stage is the bottleneck under three dispatching rules.
Port & ICD sizing from throughput →Enter TEU/year — get land, berth, yard and gate requirements for a port or ICD.
Container yard: how many ground slots, how much land? →Enter TEU/year and dwell time (days) — get the number of ground slots, area, and number of RTGs/reach stackers.
Port gate: how many lanes? →Trucks arriving at the gate second by second; number of lanes, OCR, appointment scheduling; queues and gate capacity.
View sample AI rendering: river port, inland waterway terminal →
Projects of the same type

Inland waterway port
Khuyen Luong Port

Inland waterway port
Ha Tinh general cargo port

Inland waterway port
Chem Port
Other projects in Hanoi
- AIRIMEX office building · Urban & services · 0.2 ha
- Strategic consulting for Interserco Joint Stock Company · Strategic consulting · Corporate strategy
- Ngoc Hoi dry port in southern Hanoi · Dry port & ICD · 19.3 hectares
- Gia Lam truck terminal, parking lot and car showroom · Warehousing · 2.5 hectares
SIMILAR PROJECTS?
Send your project constraints
Area, location and current stage — that's enough to get started.
Submit a consultation request