
CGD's scope of work
Construction survey and economic-technical report preparation.
Plan visuals


Run an estimate for a similar project
Automated terminal dispatching simulation →
Quay cranes, AGVs and yard cranes second by second — which stage is the bottleneck under three dispatching rules.
Port & ICD sizing from throughput →Enter TEU/year — get land, berth, yard and gate requirements for a port or ICD.
Container yard: how many ground slots, how much land? →Enter TEU/year and dwell time (days) — get the number of ground slots, area, and number of RTGs/reach stackers.
Port gate: how many lanes? →Trucks arriving at the gate second by second; number of lanes, OCR, appointment scheduling; queues and gate capacity.
View sample AI rendering: river port, inland waterway terminal →
Projects of the same type

Inland waterway port
Son Tay Port office building

Inland waterway port
Khuyen Luong Port

Inland waterway port
Ha Tinh general cargo port
Other projects in Hanoi
- ALS Phu Minh cargo terminal · Aviation · 6.9 hectares
- ALS Noi Bai cargo terminal · Aviation · 3 hectares
- ILS Hoai Duc Outlet Center · Warehouse · 3.5 hectares
- HTP Center — ILS · Warehouse · 1.5 hectares
SIMILAR PROJECTS?
Send your project constraints
Area, location and current stage — that's enough to get started.
Submit a consultation request