
CGD's scope of work
Preparation of the revised feasibility study report.
Plan visuals


Run an estimate for a similar project
Port & ICD sizing from throughput →
Enter TEU/year — get land, berth, yard and gate requirements for a port or ICD.
Container yard: how many ground slots, how much land? →Enter TEU/year and dwell time (days) — get the number of ground slots, area, and number of RTGs/reach stackers.
Port gate: how many lanes? →Trucks arriving at the gate second by second; number of lanes, OCR, appointment scheduling; queues and gate capacity.
Site screening →Screen a site: access, current status and missing documents before design.
View sample AI rendering: ICD / dry port →
Projects of the same type

Dry port & ICD
Tra Linh Logistics Center

Dry port & ICD
My Dinh Inland Container Depot (ICD) at Duc Thuong

Dry port & ICD
Ngoc Hoi dry port in southern Hanoi
Other projects in Hanoi
- Hong Van Port · Inland waterway port · 19.6 hectares
- Son Tay Port · Inland waterway port · 15 hectares
- ALS Phu Minh cargo terminal · Aviation · 6.9 hectares
- ALS Noi Bai cargo terminal · Aviation · 3 hectares
SIMILAR PROJECTS?
Send your project constraints
Area, location and current stage — that's enough to get started.
Submit a consultation request